Quilter's Planner Design Book
Quilter's Planner Design Book
This updated and expanded QP Design Book has all of the pages you love from our Quilter’s Planner, but with no calendar pages or patterns section.
It is filled with tools to help you plan and organize your projects and keep track of your quilting design ideas. Enjoy plenty of space to make lists, sketch, dream and be inspired.
A quilt-inspired coloring page is featured on the first and last pages of the book. Extra graph paper pages in a variety of styles are also included.
NOTE: If you do not see the options below to customize your design book, please refresh this page for it to show up. Contact us at hello@forcreatives.pub if you have any problems with your order.
- Production time
Each planner is printed on demand, hand assembled and bound to the format you choose. Please allow the following production times for your book to be made before it is shipped. Coil-bound, 3-Ring Binder and Looseleaf formats: 5 business days. Hardcover format: 7-12 business days.
- Shipping time
2-5 business days domestic, international shipping times depend on the country
- All sales are final
Due to the custom nature of our planners, changes can only be made to your order within 1 business day of your order being placed. If there is a misprint or if a page is out of order, we will correct the problem with your book at no charge to you. Returns are only accepted if there is a manufacturer's defect. Please email hello@forcreatives.pub if you have any questions or concerns about your order.
Couldn't load pickup availability

Features of the Quilter's Planner Design Book
-
- No calendars or patterns, leaving you plenty of space to make lists, sketch, dream and be inspired
- A quilting-inspired cover specifically made as a coloring page design that you can customize however you choose
- 8 Projects-At-A-Glance pages to list and track progress on up to 232 projects
- 4 pages to track 100-Day Projects, Monthly Projects and Yearly Projects
- 30 Project Planning Pages with accompanying Dot Grid pages to plot out your quilting designs and track all aspects of your project
- 4 Pattern Inventory pages to track your library of quilting, sewing and other crafty patterns
- My Sewing Machines page and Sewing Tools Inventory/Wishlist so you can track what you have and what you need.
- Extra planning and reflection pages: Vision Board, Goal Planning, My Bucket List and My Favorite Things
- 11 Quilting reference pages (frequent-used piecing methods, block library, color theory, binding basics, common quilt sizes, cutting estimator, curved block templates, and more)
- Yardage Planner page so you can plan how you will cut yardage before you slice it up
- Multiple kinds of graph paper (squares, dot grid, squares on point, hexagons and triangles)
- Lined pages and blank drawing paper
Some photos of the interior pages of the Design Book show the same pages from previous years of the Quilter’s Planner. -
Printed Book Dimensions & Information:
- 7" x 10" page size
- 80# paper
- Printed on both sides of the page
- 160 pages total
- Coil-bound, Looseleaf, and 3-Ring Binder Design Books work with our interchangeable covers, clip-in bookmarks and accessories
Coil-bound and looseleaf formats include your choice of our laminated cover designs. The cover is fully bound with the rest of the book by default, but you can choose to get your cover cut with prongs so it is interchangeable with our other clip-in covers.
The Looseleaf format includes your chosen cover design as a laminated cover with a wide left edge (perfect for punching custom holes or for a disc-bound system) or a custom-sized paper to fit inside a binder you already have. The pages and cover do not have any holes punched.
The 3-Ring Binder format includes the pages of the Design Book inserted into our custom 2-inch 3-Ring Binder, with your chosen cover design inserted into the front cover.
Hardcover format features your chosen cover design on a smooth, matte finish cover. Note: Design Books in this format will ship separately from any other items purchased.